Monday, August 24, 2020

Pot Tending Machine Essay Example

Pot Tending Machine Essay Anode checking Cleaning the cavity by scoop Placing new anode Covering of anode New anode in this way set beginnings drawing current following 2-3 hours. To check if new anode is set appropriately, it ought to pull back current inside the scope of 0. NV to 1. 5 NV following 16 hours. Deformities in anode change: I) Low set anodes-For this situation, anode draws higher current. It can bring about clad disappointment and square drop and henceforth upset the metal steadiness. II) High set anodes-The anode set Like this will draw less current. Subsequently, the neighboring anodes will draw high current causing a voltage shake. Iii) Improper turning This leaves coke and large covering pieces Jutting out in the depression shaping mushrooms and spikes which will move the metal in the pot ,bringing about voltage shake. Iv) Improper Anode Covering-This causes anode consuming and drop outs.The falter creation of metal In the pot room Is 2-2. 4 tons around. I Norte, residency Is a need to nave an attractive Ana tamale Dalliance, metal cushion steadiness and to forestall additional warmth misfortune because of high metal level. For this reason, tapping is performed utilizing a 16 ton limit nonmagnetic snare which keeps up an ideal shower level constraining the cooling inclination of pot. 16 MAT Tapping streetcar Firstly, the pouring spout is shut with an asbestos ring. The tapping hose pipe goes into the endeavor. The tapping gap is made greater or skimming is never really out coke or lose carbon dust utilizing a preheated carbon scoop. We will compose a custom exposition test on Pot Tending Machine explicitly for you for just $16.38 $13.9/page Request now We will compose a custom paper test on Pot Tending Machine explicitly for you FOR ONLY $16.38 $13.9/page Recruit Writer We will compose a custom paper test on Pot Tending Machine explicitly for you FOR ONLY $16.38 $13.9/page Recruit Writer Around 3 spoons, again preheated to stay away from blast with dampness, are utilized with a tare weight of not in excess of 8000 barrel. The guide of the scoop is set into the tapping gap and the air valve is opened to begin the tapping activity. The last weight of the spoon must not surpass the ideal load by in excess of 20 barrels. In the wake of tapping; the scoop is put on Mats for transport. A pot controller keeps a mind the tapping procedure dependent on he voltage expanding pattern. On the off chance that the voltage recognized is higher than 80 NV, the essential anode is brought down naturally for around 0. 8 seconds. This aides in keeping up the anode cathode separation consistent, when metal level falls during tapping. Further if anode impact happens, tapping is put to an end till the end of anode impact. On the off chance that the voltage deviation between expected voltage and the voltage distinguished in persistent 3 min after aluminum tapping begins is not exactly numb or all out time of anode bringing down is not as much as cosec, programmed aluminum tapping control leave work is enacted. The last metal tapping sum relies upon pot temperature, metal stature, shower tallness, and Creosote proportion and commotion level inside the pot. Different variables controlling the tapping sum are voltage shake, anode impacts and different irregularities. Bar RAISING: as of now referenced, the anode pillar gets devoured in the end and has a complete voyaging separation of just 40 SMS, it should be raised to keep up a consistent anode and cathode separation of 4. 5 SMS. Pillar raising utilizes two helper snares of 16 tons limit each for conveying the shaft raising Gig. All through this, a hose reel coming out of APT gives a compacted IR flexibly to the pillar raising get together for keeping up a suggested weight of 6 bars. Every anode bar is embedded into the green legs of Gig outline and the snares are left free with the goal that entire edge lays on superstructure of pot . A wrench is brought down until the apparatus is totally on the shaft of the anode clasp . So now, the cinches are slackened and there is a level bar raising guaranteeing pot voltage doesn't surpass 200 NV. At the point when the shaft ascends to the necessary point, all the clips are fixed, anode bars are discharged, Gig outline moves to an unmistakable situation over the pot ND a similar activity goes on in next portion of the pot.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.